Installed Capacity |
: |
310 MW (2 x 155) |
Annual Energy Production |
: |
1 Billion kWh |
Volume Of CO2 Emmissions Saved By This Project |
: |
525.00 Metric tons / year |
Number Of Trees Equivalent To CO2 Saving |
: |
2 Million |
Number Of Households That Will Benefit From The Energy Production |
: |
555.000 |
Reservoir Volume |
: |
643 Million m3 |
Irrigation Area |
: |
Imamoğlu Plains |
Imamoğlu Plain Irrigation Area |
: |
75.000 Hectares |
Start Date |
: |
July 2007 |
Commisioning Date |
: |
December 2010 |
Duration For Construction And Installatation |
: |
1250 days/ 3,4 Years (a World Record In Its Kind) |
Total Constructional Mass Of Dam |
: |
4 Million m3 |
Height Of Dam |
: |
130 m |
Certificate |
: |
Verified Carbon Standart (VCS) |
PLANNING, PROJECT, CONSTRUCTION AND MECHANICAL WORK 100% BY TURKISH ENGINEERS AND TURKISH COMPANIES. |
Sani Bey Dam and Hydroelectric Plant